2/23/2005 - Preparing the presentation

  
This week we spent most of the time building the prototype and getting ready for the presentation on 02/28/05. Our process was slowed down a little bit due to the fact that the RF transceiver sent by Abacom-tech was different from the one that we ordered. They accepted their mistake and agreed on sending the correct one within 2 days. Everyone was working on the validation review for the project.

Omar Elsahy:
• Helped building the prototype
• Assigned respective completion dates for task submission, approved it from team members
• Conducted further extensive research of required equipment and began draft documentation

Fernando Souto:
• Built the prototype
• Altered the schematics
• Looked into validation review
• Researched on new modifications

Aldwin Saugere:
• Implemented the Graphical User Interface
• Modified the database
• Implemented the positioning algorithm

Ajit Gaddam:
• Research on programming the PIC micro controller
• Working on PIC Program implementation for prototype
• Software testing of the code generated and its implementation
• Software to interface hyper terminal for serial communication

Anand Mehta:
• Studied 2-wire RS232 protocol interface through C::COM and PIC programming
• Established necessary pin connections, signal levels and restrictions on RF transceiver module.
• Composed PIC function to randomly generate values between 0 and 255.
• Obtained PICbasic pro compiler and CodeDesign lite (editor).

Milinda Wathugala:
• Built the prototype
• Looked at old schematics to use in Pspice

Thanujan Ratnarajah:
• Built the prototype
• Worked on new modifications
• Looked into the parts specification that needs to be altered.
• Researched on the possible power sources.



4/7/2005 - Testing the system for performance
3/30/2005 - Testing phase
3/23/2005 - Building the Tag
3/2/2005 - Building the prototype
2/23/2005 - Preparing the presentation
2/16/2005 - Circuit schematics
2/9/2005 - Positioning algorithm
2/2/2005 - Defining tasks
1/19/2005 - New design
12/1/2004 - Tags and access points
11/17/2004 - Alternative design
11/10/2004 - Bluetooth specification research
11/3/2004 - PDR presentation
10/20/2004 - Bluetooth development kits
10/13/2004 - Having Bluetooth as our protocol
10/6/2004 - Network protocols
9/24/2004 - Researches into the technical part

Trade Show presentation
Brochure (high resolution)
Work Breakdown Structure
3D presentation of the WRNS (need the DivX codec)
DivX codec to watch the presentation
Validation Review
Validation Review presentation
3D rendered pictures of the Tag
Priliminary Design review
Priliminary Design review presentation
Critical Design review
Critical Design review presentation
Business Plan