2/16/2005 - Circuit schematics
During this week we, as a team spent time of finishing the systems circuit schematics. The early stage of hardware building is completed. The final stage for the prototype will be done the next week. Task was assigned to each member to start working on the validation review.
Omar Elsahy:
Designed, completed and revised the updated Gantt Chart
Initiated verification of hardware design, schematic modifications, etc.
Completed and printed updated Business Plan
Assigned respective completion dates for task submission, approved it from team members
Conducted further extensive research of required equipment and began draft documentation
Fernando Souto:
Worked on the schematics
Looked into validation review
Researched on new modifications
Aldwin Saugere:
Implemented the Graphical User Interface
Created the database
Implemented the positioning algorithm
Ajit Gaddam:
Research on programming the PIC micro controller
Working on PIC Program implementation for prototype
Software testing of the code generated and its implementation
Software to interface hyper terminal for serial communication
Anand Mehta:
Studied 2-wire RS232 protocol interface through C::COM and PIC programming
Established necessary pin connections, signal levels and restrictions on RF transceiver module.
Composed PIC function to randomly generate values between 0 and 255.
Obtained PICbasic pro compiler and CodeDesign lite (editor).
Milinda Wathugala:
Worked on learning Pspice
Went to buy parts
Looked at old schematics to use in Pspice
Thanujan Ratnarajah:
Worked on the schematics of the Tag and Access Points
Worked on new modifications
Looked into the parts specification that needs to be altered.
Researched on the possible power sources.
4/7/2005 - Testing the system for performance
3/30/2005 - Testing phase
3/23/2005 - Building the Tag
3/2/2005 - Building the prototype
2/23/2005 - Preparing the presentation
2/16/2005 - Circuit schematics
2/9/2005 - Positioning algorithm
2/2/2005 - Defining tasks
1/19/2005 - New design
12/1/2004 - Tags and access points
11/17/2004 - Alternative design
11/10/2004 - Bluetooth specification research
11/3/2004 - PDR presentation
10/20/2004 - Bluetooth development kits
10/13/2004 - Having Bluetooth as our protocol
10/6/2004 - Network protocols
9/24/2004 - Researches into the technical part
Trade Show presentation
Brochure (high resolution)
Work Breakdown Structure
3D presentation of the WRNS
(need the DivX codec)
DivX codec to watch the presentation
Validation Review
Validation Review presentation
3D rendered pictures of the Tag
Priliminary Design review
Priliminary Design review presentation
Critical Design review
Critical Design review presentation
Business Plan