10/13/2004 - Having Bluetooth as our protocol
Last week the team met twice to discuss the technical issues of the project. During the 7th of October meeting every team member was given a chance to talk about his research on Wi-Fi and to reason out why he preferred to have Bluetooth or Wi-Fi as the communicating protocol. After a long discussion the majority of the team members concluded that having Bluetooth as our protocol will be beneficial in both technical and market aspects. During Sunday (10/10/04) meeting all of us concentrated on the Gantt chart and the team duty chart. Each member was allocated major tasks for the entire project. The team agreed that as a starting step the entire system should me modelled before starting to build it. Finding the suitable Bluetooth kit was another challenged faced by the team. Every one was asked find at least three development kits to bring it to the next meeting.
Omar Elsahy:
• Researched about different types of Bluetooth Kits to be ordered
• Began procedures to materials order placement
• Designed along with team members the model and overall tree diagram of project
• Proceeded in required documentations of funding and publishing
• Assisted in compilation of the updated Business Plan
• Finalized designated sections of Business plan
Fernando Souto
:
• Researched on Bluetooth Development Kits
• Researched on Bluetooth protocol stacks
• Developed a basic initial system model
• Revised the Business Plan
• Revised the organizational chart
Ajit Gaddam
• Worked on the organizational chart
• Searched for cheaper Bluetooth SDK’s.
Aldwin Saugere
● Worked on re designing the web site
● Researched on the power consumption part of the project
Anand Mehta
• Researched on the different available Bluetooth Development kits
• Researched on the effect of temperature on Bluetooth chips
• Revised the Business plan
Millinda Wathugula
• Researched on the wireless protocols
• Did further research on Bluetooth chip and development kits
Thanujan Ratnarajah
• Compared different types of Bluetooth development kits
• Worked on the Gantt chart
• Started modeling the entire system
• Worked more on the Business plan