9/24/2004 - Researches into the technical part

  
Primarily, from Monday, 13th of September 2004 to last Monday, September 20th 2004, the group has had two conferences. At the first meeting, the group reported to all the present members on how they had advanced and made headway with their respective individual research. The meeting time for this semester was decided during this meeting:

• Thursday at 8:00p.m.
• Sundays at 12:00 p.m.


Omar Elsahy:

• Research on actual design of transceiver specifications
• Research on Bluetooth implementation to transceiver.
• Research on market demand of product.
• Set up fixed meeting schedule times.
• Worked on the Business plan
Fernando Souto:

• Research on transmitter design and implementation of Bluetooth technology.
• Research in cost of Project WRNS design.
• Discussed proposed Business Plan breakdown to members.

Ajit Gaddam:

• Researched the commitment factors of the project towards management.
• Discussed Business Plan schedule and individual tasks.
• Discussed the fixed times of meetings.


Anand Mehta:

• Research the main features of the product.
• Researched on the Bluetooth developer kit
• Worked on the Bussiness plan

Milinda Wathugala:

• Research on Bluetooth and the competition
• Team meeting; sections of the Business plan were given to individuals to cover.
• Further research on what Out-of-Bounds is and how they are written
• Researched on the wireless protocols



Thanujan Ratnarajah:

• Technical specifications of the project
• The Business plan report
• Individuals were given specific topics to cover in Business Plan



Aldwin Saugere
• Worked on the Web page
• Researched about the wireless protocols

Our subsequent gathering largely hinged on establishing a further research into the technical part and completion of the Business Plan. Development of the current web page was also discussed. Basically the last week was spent on planning to project matters for this semester.


4/7/2005 - Testing the system for performance
3/30/2005 - Testing phase
3/23/2005 - Building the Tag
3/2/2005 - Building the prototype
2/23/2005 - Preparing the presentation
2/16/2005 - Circuit schematics
2/9/2005 - Positioning algorithm
2/2/2005 - Defining tasks
1/19/2005 - New design
12/1/2004 - Tags and access points
11/17/2004 - Alternative design
11/10/2004 - Bluetooth specification research
11/3/2004 - PDR presentation
10/20/2004 - Bluetooth development kits
10/13/2004 - Having Bluetooth as our protocol
10/6/2004 - Network protocols
9/24/2004 - Researches into the technical part

Trade Show presentation
Brochure (high resolution)
Work Breakdown Structure
3D presentation of the WRNS (need the DivX codec)
DivX codec to watch the presentation
Validation Review
Validation Review presentation
3D rendered pictures of the Tag
Priliminary Design review
Priliminary Design review presentation
Critical Design review
Critical Design review presentation
Business Plan